File Photo
1. At the suture joint, re-coaching must be repaired, and the end of the skipped suture part must be re-absorbed.
2. In all areas except rocky slopes, loopholes or torn areas shall be repaired and stitched with geotextile patches of the same material.
3. At the bottom of the landfill, if the crack length exceeds 10% of the coil width, the damaged part should be cut off, and then the two parts of the geotextile are connected.
Source: Online/NAN
Comment Now